AC Systems, Sovereign House
Horizon was brought in to install all the Mnet cabling throughout the AC system at sovereign house, This entailed 11x outdoor units feeding 108x indoor units and 11x BC boxes over 7 floors We also installed cabling for a central control and addressed all the devices. All the Electrical supplies needed power monitors so the client had the diversity to lease parts of the building. Horizon also completed the electrical final connections to the indoor and outdoor units.
Project duration: 60weeks
Main materials used: 10,000m of Mnet cabling.see more