Tosh Tall Floors

This Particular Growth project required an upgrade in the electrical capacity for extra cooling to the active Datacentre New distribution circuit was installed from the Low voltage switch Board to feed a new distribution board.

This in turn supplied power to the Distribution energy meter, 2x New AC indoor and Outdoor units within the data centre with separate supplies to the condensate pumps, all equipment was installed in containment.Additionally, this AC System was required to be installed and connected to an external monitoring systems with use of RS485 interface.

The system was connected to monitor:
• Major/Minor faults
• Sensors that monitored Inlet/Outlet, Temperature & humidity
• Power Monitoring

Upon completion all circuits installed are required to be fully inspected, tested, labelled and a certificate issued.